VOERN SystemsMetro Vancouver, CanadaCorporate purchasing

VOERN Systems / Canada

Private compute
systems.

Custom AI workstations, GPU servers and rack integration for teams that run their own hardware.

Illustrated system configurations

Hardware catalogue

Systems by form factor

A machine for one desk, a shared server, or a complete rack at your site.

Private AI infrastructure

One model.
Different demands.

A model that runs comfortably for one developer can stall when a team sends long prompts at once. Size the system for the busiest hour.

Compare private AI systems
Weight memory32B model
4-bit
16 GB
8-bit
32 GB
16-bit
64 GB

Illustrative minimum for weights alone, in decimal GB. Runtime, quantization metadata and context need additional memory.

Calculate another model size

System finder

Match the system to the workload.

Where does the team lose time?

Recommended starting point

Desk-side workstation

Keep the working set at the desk when one engineer needs quick feedback and jobs rarely overlap.

Bring
The largest model or assembly the engineer opens in a normal session.
Test
Peak memory and response time while editing, not just time to finish a batch.
Explore workstations

Recommended starting point

Shared inference server

Put compute behind a network endpoint when requests overlap. Size for the busiest interval, not the total number of accounts.

Bring
Model, precision, maximum context and simultaneous requests.
Test
Time to first token and output rate per request under concurrent load.
Compare inference systems

Recommended starting point

Dedicated render node

Move final frames off the artist's workstation when a queue blocks editing or misses its delivery window.

Bring
A representative scene, textures, renderer version and frame deadline.
Test
Asset-load time and render time separately. Confirm worker licensing before adding nodes.
Size a render node

Recommended starting point

Shared storage and local scratch

Trace the read and write paths before adding GPUs. Several workers opening the same assets can exhaust a shared link.

Bring
An actual job folder, the number of workers and the size of temporary outputs.
Test
Concurrent read throughput, small-file latency and time to commit completed results.
Scope the data path

Configuration comparison

Two builds to price.

Private inference sizing examples, not stock listings or tested performance claims. Exact parts, availability and price belong on the written quote.

W1-R1 and S1-R1 reference configurations for private inference
Build ID W1-R1Desk-side workstation S1-R1Shared GPU server
PartsOne 32 GB GPU, 128 GB system RAM and 2 TB NVMe working storage.Two 48 GB GPUs, 256 GB system RAM and separate boot and working storage.
SiteOffice or lab. Confirm outlet capacity, tower clearance and acceptable fan noise at the desk.Equipment room. Confirm rack depth, circuit and connector type, inlet cooling and network ports.
Quote scopeSpecify the operating system, display connections and whether a second drive is needed.Itemize rails, power cords, network adapters and remote management access.
PricingQuote W1-R1 in CADQuote S1-R1 in CAD

GPU memory is per card. Two 48 GB GPUs do not automatically fit a 96 GB model. Confirm that the target runtime supports splitting it, or size each replica to fit one card.

Storage engineering

Follow a job through storage.

Size the shared path for workers reading together. Keep disposable intermediates local and return the files the team needs to retain.

Source readsResult writes
Durable tierShared volumeSource assets and retained results
TransportNetwork fabricStorage uplink, switch and client ports
Execution tierCompute workersNode-local scratch for temporary files
Workers read source assets across the fabric, process them locally, then write completed results back to the shared volume. Protect retained files with a separate, restore-tested backup.
Concurrent read example

4 workers × 200 MB/s = 800 MB/s

Aggregate payload demand, before overhead or competing writes. Test the array, uplink and clients together.

Review the storage sizing guide

Design & visualization

Size the render queue

Keep the artist’s workstation interactive. Give final frames a separate time budget.

Illustrated impeller with a shaded surface and triangular mesh
Surface and mesh study

Frame-time budget

2 minper frame · one worker

Available minutes divided by frames. Leave time for loading, retries and compositing.

Read the rendering guide

GPU server architecture

Inside a GPU server

A GPU count is only part of a specification. Check these three constraints before selecting a chassis.

Illustration of an open rackmount server showing accelerator shrouds and front drive bays
Illustrative chassis · final layout depends on the build
Accelerator clearance
Card thickness, length and power connectors determine which adjacent slots remain usable.
Cooling under load
Match the GPU cooling type to chassis airflow. A short boot test cannot establish sustained operating temperature.
Service access
Allow room to withdraw the server, service its drives and disconnect cables without disturbing adjacent nodes.
GPU server configuration guide

Technical services

Start with the hardware you own.

A memory upgrade, a software rebuild or a storage change can be enough. Bring the current parts list and the job that is slowing down.

  • Check existing components and expansion limits.
  • Separate reusable parts from proposed replacements.
  • Agree on a test your team can repeat after handover.
Integration & handover
Illustration of a technician fitting memory to an open workstation
Workstation integration illustration

Rack integration

An empty rack unit tells you the height available. Rail depth, rear clearance and the route into the room determine whether the system can actually be installed.

Rack elevationFront view / example
  1. U08 Patch panel1U
  2. U07 Access switch1U
  3. U06 Blanking panel1U
  4. U04-05 Compute node2U
  5. U01-03 Storage chassis3U

8U segment only. The elevation reserves space; rear cabling and power feeds need a separate map.

Physical site checklist

Rack & rails
Measure post spacing, check the mounting holes and allow room behind the chassis for connectors and the closed door.
Power & cooling
Identify available PDU outlets and feed capacity with facilities. Match equipment airflow to the room's intake and exhaust paths.
Network handoff
Assign switch ports, link speeds and cable types. Reserve a management port and identify who can enable it.
Receiving & access
Confirm the delivery appointment, doorway and lift clearances, rack load rating and who will handle the lift into position.
Review rack integration scope

Build, test & handover

Agree on a workload and a pass condition before ordering. A system that boots has not yet passed an application test.

  1. Build to the approved list

    Record installed parts, serials, firmware and driver versions against the quote revision.

  2. Run the agreed workload

    Keep the input, command, measurements and logs together so the receiving team can repeat the run.

  3. Close the handover

    List open exceptions, their owners and the retest criteria. Record buyer sign-off separately from the bench result.

EXAMPLEBench record / 001

Acceptance record

Render workstation · Synthetic scene test

Build reference
WS-01 / parts list rev. B
Test setup
Blender 4.2 LTS, Cycles GPU, scene S-01, 1920 × 1080, 64 samples
Pass condition
Render frames 1-120 in 30 min or less; all frames readable and no render errors.
Observed
27 min 18 s · 120/120 frames readable · 0 render errors
Evidence
Run log, frame manifest and installed configuration attached to sample record.
Bench result PassBuyer sign-off Pending

Illustrative values, not a product benchmark.

Corporate purchasing

Compare the installed, tested system in Canadian dollars (CAD), not just the chassis price. Keep optional work outside the base total so purchasing can approve it separately.

Inside the quote

Hardware
Request model or part number, quantity, unit price in CAD and extended price. Separate reusable buyer-owned parts from new equipment.
Delivery scope
Mark rails, cords, freight, installation, configuration and acceptance testing as included, optional or excluded. Show taxes separately.
Changes
For a proposed substitution, record the original and replacement parts, fit and workload implications, price difference and revised timing. Require written approval before order placement.
Compare hardware quotes

Buyer questions

What should accompany an RFQ?

Send the workload, required quantities, delivery city, target date and a measurable acceptance criterion. Flag any mandatory parts or approved alternatives.

Can we reuse existing equipment?

List exact models, interfaces and remaining rack space. Ask for compatibility checks and integration labour as separate lines; clarify who supports the reused parts.

What if a quoted part changes?

Ask for a revised quote before approving the alternative. Equal capacity alone does not establish equivalent cooling, performance or warranty coverage.

Who handles a warranty return?

Ask the quote to name the fault contact and assign removal, return freight and reinstallation. Parts coverage and on-site labour are separate items.

Prepare a project inquiry

Technical resources

Engineering library

Calculators, workload notes and purchasing guides for the team specifying your next system.

VOERN Systems / Corporate sales

Bring us your specification.

Include required parts, permitted alternatives and the delivery location. We’ll scope the hardware and labour separately in Canadian dollars.